Zul'jinn went home at the second hour of the night, stood at his wall plan for three minutes, and came back to the forge district workshop.
He brought the installation plans. He laid them on the primary worktable and began pulling numbers.
The northern perimeter arc required twenty-three wall-mount positions in total: twelve primary installations on the wall face, seven secondary bracing points on the interior support structures, four anchor systems at the arc's terminal points. At current output, his crews completed two primary installations every three days and one secondary brace every two days. He did the calculation on the planning sheet without pausing. At current pace, the full northern arc needed thirty-nine days. He had fourteen.
He pulled the secondary bracing from the sequence.
